Shea Boulevard Improvements
Project Description
Shea Boulevard work consisted of adding a westbound travel lane and right turn lane, extend retaining wall and guardrail, storm drain improvements (catch basins, rip rap and concrete pipe), curb and cutter, sidewalk, remove and mill asphalt and pave new asphalt from Technology Drive to Beeline Highway, traffic signals improvements, grading and ABC, striping and signage and landscaping.
Owner: Arizona Department of Transportation (ADOT)
Location: Fountain Hills, Arizona
Market: Street Construction
Services: Asphalt Paving, Concrete, Grading, Milling